Unsteady | Kleinschmidt

My Unsteady HEC-RAS Model is Unstable…Why?

This question (or some variation of it) comes up quite a bit on The RAS Solution:  “I have an unsteady flow model.  When I run it, it goes completely unstable.  What is causing this?”  Many times a screen shot of the computation window with the dreaded “red bar” is attached. While the person asking the […]

Read More

Sediment Transport Features in HEC-RAS 5.0

The new 2D features and mapping tools are the most anticipated new features in HEC-RAS 5.0. However, HEC also added a couple major new sediment features, as well as many minor features and a few substantial bug fixes (e.g. SI Units). The two major features are the ARS-USDA Bank Stability and Toe Erosion Model (BSTEM) […]

Read More

Tuesday Tip of the Week–Axis Zooming for True Peak Discharge

Another simple, yet very convenient tool not found discussed in the manuals is the ability to zoom in on one of the axes of a graphical plot.  This is especially useful when trying to determine if you’ve captured the true peak discharge in a steeply rising hydrograph.  Take the following example: an unsteady flow dam […]

Read More

Lateral Structure Coefficients

Lateral structures can be used in HEC-RAS to transfer flow from a river/reach to a storage area, or to another river/reach.  With the coming release of HEC-RAS with 2D capabilities (estimated beta release January/February 2014), you’ll be able to hook a river/reach to a 2-D area using a lateral structure. Although its primary function in […]

Read More

Stabilizing a Dynamic Unsteady HEC-RAS Model

One of the most frustrating aspects of unsteady HEC-RAS modeling can be the model stabilization process. You know, you’ve gone to great lengths collecting the best survey/topo data and solid hydrology. Then you’ve painstakingly spent hours…possibly days entered all of that data only to find that once you press the “Compute” button, the model crashes. […]

Read More

Dam Breach Class Boston, MA May 1-3, 2013

Hi everyone. For those of you who are HEC-RAS dam breach enthusiasts, I will be teaching a 3-day course on dam breach modeling with HEC-RAS in Boston in a few weeks. The course will be held next to the historic MIT campus overlooking the Charles River and downtown Boston, May 1-3. In this course you’ll […]

Read More

Extending your Cross Sections to High Ground?

What are the implications of having a cross section that is too short and doesn’t extend all the way out to the highest computed water surface elevation?  Does it affect the results?  Take this cross section for example. It is missing much of the left overbank (presumably). Image courtesy of Adam Bohnoff First of all, […]

Read More